Website powered by

Corner for Schneider Electric

Schneider Electric case study.

The client
Moscow agency DoubleUp for Schneider Electric

Time
Design and documentation for production - 2 weeks
Production - 3 weeks

Project team
At the design stage, there were 2 people. Project manager and me as a designer.

Overview
The client is provided us some raw concepts and a brief explanation of the idea, so my role was to bring the concepts to life in the most expedient way. The corner introduces a new APC product each one on its own stand and it can be observed from every side. The final version approved by the client includes three product display stands with the integrated LED. Sidewalls assembled from banners attached to the metal frames. The glossy floor contains all the electric commutation and was made of laminated OSB. The total area of the corner is ​​12 m².

Assembled and ready to use

Assembled and ready to use

Assembled and ready to use

Assembled and ready to use

Photo simulation

Photo simulation

3D model concept

3D model concept